SOLUTIONS

Services

Technical Manpower Supply

At peak times during a project or operation additional specialist manpower may be required to meet deadlines and objectives. Prism maintains an extensive database of experiences EHS professionals who can be seconded in to meet short term needs. Prism is also able to second full teams to perform the safety function for project and operations.
Show

Services

Construction, Hook-up & Commissioning

The construction, hook up and commissioning phases of developing a facility typically involve a range of occupational hazards, from working at height to manual handling and dropped objects. Further, it is not uncommon for several tasks to be performed concurrently, potentially introducing unforeseen hazards to the safe execution of one or another task. PRISM conducts Construction Risk Assessments (CRA) which systematically review the activities to identify the potential for hazards, review the safeguards and propose recommendations to mitigate the risks. We also develop Operating Procedures, Maintenance build and Ex-equipment register so that the Asset owner is ready to operate soon after commissioning.
Show

Services

Late Life Operations

Frequent breakdowns, Obsolescence, degraded performance, corrosion are among a myriad of challenges in operating an ageing asset. We work with our clients to develop a late-life strategy for existing assets to extract maximum value from assets. Prism got a structured approach to advise our client to develop Fit-for-purpose maintenance and inspection strategy. We identify those activities that do not deliver cash or improve safe operations. We can revise safety case to reflect lean operations, identify process de-bottlenecking opportunities ,develop equipment Preservation plans apart from studies to efficiently operate an ageing facility.
Show

Services

Decommissioning

Decommissioning within budget and without HSE incidents are significant challenges for an asset owner. We from PRISM can be your compliance partner for your decom execution journey. For the decom execution, PRISM can support with asset integrity assurance, cataloguing for reuse, Hazard identification and relevant Environmental studies.
Show

Services

Environmental Impact Assessment

As humans seek to develop and improve living standard we must ensure that these gains do not come at the long term expense of the planet. The best time to start minimising impact from a development is at the concept stage when it is possible to incorporate measures inherently into the design. Prism applies technical analysis and predictive models to minimise environmental impact, reduce CO2 emissions, optimise energy usage and minimise waste from developments. We apply solutions throughout the facility lifecycle.
Show

Services

Asset Reliability Management

Safe, reliable, efficient operations are becoming increasingly difficult due to Increasing economic pressures, tightening regulations and limited resources. Well planned and executed maintenance and reliability management is critical to plant safety and efficiency. Reliability management developed from the design stage and optimized for the Operational phase should fit the purpose. PRISM brings in technical expertise in reliability engineering from the consultants who worked in Front line Operations and Maintenance. Our approach is focused on concentrating time and effort on the areas of most significant potential benefit and providing pragmatic solutions. We can support most of the popular CMMS systems, APM tools, or reliability tools our client prefers. We also have in-house reliability digital tools that greatly benefit our clients.
Show

Have a question or need advice?

Speak to our experts.